Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority.

Utility Dockets and FilingsConnecticut Public Utilities Regulatory Authority

New Third Party Verifier

Correspondence

Filed by EOE

Part of

Application of Algonquin Power Windsor Locks, LLC for Qualification of Algonquin Power Windsor Locks Co-Gen as a Class III Renewable Energy Source

Type of filing
Correspondence
Date filed
March 23, 2026
Filed by
EOE
Files
Not listed yet

As listed on the current system

Corres. 03/23/2026 [12-09-19] (EOE) - New Third Party Verifier

This filing on the current system (opens in a new tab)

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)