Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Final Evaluation report: HES Additional Measure Review (R48)

CorrespondenceFiled by Ct Energy Efficiency BoardNo files listed
Part of docket 13-03-02Closed
  • Electric
  • Gas
PURA/BETP Consideration of 2013-2015 Conservation and Load Management Plan

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Corres. 01/05/2015 [13-03-02] (Ct Energy Efficiency Board) - Final Evaluation report: HES Additional Measure Review (R48)

This filing on the current system (opens in a new tab)