Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Evaluation of the Year 2 CL&P Pilot Customer Behavior Program (R2), final report, 8-8-14

CorrespondenceFiled by Ct Energy Efficiency BoardNo files listed
Part of docket 13-03-02Closed
  • Electric
  • Gas
PURA/BETP Consideration of 2013-2015 Conservation and Load Management Plan

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Corres. 08/19/2014 [13-03-02] (Ct Energy Efficiency Board) - Evaluation of the Year 2 CL&P Pilot Customer Behavior Program (R2), final report, 8-8-14

This filing on the current system (opens in a new tab)