Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Motion No. 026

Motion to Confirm that Requirements of Oct 30 2019 Order Have Been Met

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Motion No. 026 07/01/2020 (C-TEC Solar LLC) - Motion to Confirm that Requirements of Oct 30 2019 Order Have Been Met [13-08-14RE03]

This filing on the current system (opens in a new tab)