A prototype public docket site for the Connecticut Public Utilities Regulatory Authority.

Utility Dockets and FilingsConnecticut Public Utilities Regulatory Authority
Compliance Filing, Order No. OneFiled by Filed in Error by Co., see Dk. 07-02-11RE02

First quarter 2018 production report for the Mansfield Hollow Hydro, LLC hydro-electric facility

Part of

Docket 14-05-32Closed

Application of Mansfield Hollow Hydro, LLC for Qualification of Mansfield Hollow Hydro Project as a Class I Renewable Energy Source

Type of filing
Compliance filing (Compliance Filing, Order No. One)
Date filed
July 26, 2018
Filed by
Filed in Error by Co., see Dk. 07-02-11RE02
Files
Not listed yet
As listed on the current system: Compliance Filings, 07/26/2018 [14-05-32] Order No.One / Filed in Error by Co., see Dk. 07-02-11RE02 / First quarter 2018 production report for the Mansfield Hollow Hydro, LLC hydro-electric facility

This filing on the current system (opens in a new tab)

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)