A prototype public docket site for the Connecticut Public Utilities Regulatory Authority.

Utility Dockets and FilingsConnecticut Public Utilities Regulatory Authority
Compliance Filing, Order No. OneFiled by William P. Short Iii

Third quarter 2021 production report for the Bethel Mills Electric hydro-electric dam

Part of

Docket 15-01-23Closed

Application of Bethel Mills Electric, LLC for Qualification of Bethel Mills Hydroelectric Project as a Class I Renewable Energy Source

Type of filing
Compliance filing (Compliance Filing, Order No. One)
Date filed
January 19, 2022
Filed by
William P. Short Iii
Files
Not listed yet
As listed on the current system: Compliance Filings, 01/19/2022 [15-01-23] Order No.One / William P. Short Iii / Third quarter 2021 production report for the Bethel Mills Electric hydro-electric dam

This filing on the current system (opens in a new tab)

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)