Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing, Order No. 1

Q3 2023

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Compliance Filings, 01/15/2024 [15-03-33] Order No.1 / Pump Technology Inc. / Q3 2023

This filing on the current system (opens in a new tab)