Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Written Exceptions

ExceptionFiled by Clearview ElectricNo files listed
Part of docket 15-06-15Closed
  • Electric
PURA Variable Electric Rate Study

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Exception to Decision filed 09/21/2015 (Clearview Electric) [15-06-15] | Exception to Decision filed 09/21/2015 (Inc.) [15-06-15]

This filing on the current system (opens in a new tab)