Draft decisionFiled
Revised Draft Decision
Part of
Docket 15-12-18Closed
Application of Cellco Partnership d/b/a Verizon Wireless for Approval of a Construction Plan to Install Wireless Facilities Within Certain Public Rights-of-Way – New Haven CT SC9
- Type of filing
- Draft decision (Revised Draft Decision)
- Date filed
- March 29, 2016
- Filed by
- Not recorded
- Files
- Not listed yet
As listed on the current system: Revised Draft, 03/29/2016 [15-12-18]
Files
The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)