Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority.

Utility Dockets and FilingsConnecticut Public Utilities Regulatory Authority

Report provided at 5/24 Hearing

Correspondence

Filed by Vernon Walker

Part of

Application of Cellco Partnership d/b/a Verizon Wireless for Approval of a Construction Plan to Install Wireless Facilities Within Certain Public Rights-of-Way – Danbury CT SC4

Type of filing
Correspondence
Date filed
May 24, 2017
Filed by
Vernon Walker
Files
Not listed yet

As listed on the current system

Corres. 05/24/2017 [16-05-22] (Vernon Walker) - Report provided at 5/24 Hearing

This filing on the current system (opens in a new tab)