Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority.

Utility Dockets and FilingsConnecticut Public Utilities Regulatory Authority

Acknowledgement Letter_Adam and Potts

Correspondence

Filed by PURA

Part of

Application of Cellco Partnership d/b/a Verizon Wireless for Approval of a Construction Plan to Install Wireless Facilities Within Certain Public Rights-of-Way – Old Saybrook SC3 CT

Type of filing
Correspondence
Date filed
August 22, 2016
Filed by
PURA
Files
Not listed yet

As listed on the current system

Corres. 08/22/2016 [16-08-29] (PURA) - Acknowledgement Letter_Adam and Potts

This filing on the current system (opens in a new tab)

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)