Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority.

Utility Dockets and FilingsConnecticut Public Utilities Regulatory Authority

Notice of Proceeding

Notice

Filed

Part of

Application of Cellco Partnership d/b/a Verizon Wireless for Approval of a Construction Plan to Install Wireless Facilities Within Certain Public Rights-of-Way – Clinton SC1 CT, New Canaan SC1 CT, Newington SC1 CT, and Plainville SC2 CT

Type of filing
Notice (Notice of Proceeding)
Date filed
August 22, 2016
Filed by
Not recorded
Files
Not listed yet

As listed on the current system

Notice, Notice of Proceeding 08/22/2016 ( ... ) [16-08-32]

This filing on the current system (opens in a new tab)

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)