A prototype public docket site for the Connecticut Public Utilities Regulatory Authority.

Utility Dockets and FilingsConnecticut Public Utilities Regulatory Authority
ScheduleFiled

Docket schedule (dates for hearings, deadlines, and decisions)

Part of

Docket 16-10-46Closed

Application of Cellco Partnership d/b/a Verizon Wireless for Approval of a Construction Plan to Install Wireless Facilities Within Certain Public Rights-of-Way – Avon SC5 CT

Type of filing
Schedule (Docket schedule)
Date filed
May 9, 2017
Filed by
Not recorded
Files
Not listed yet
As listed on the current system: TS External [16-10-46] [CBK] Last Revised: 05/09/2017

This filing on the current system (opens in a new tab)

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)