Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Please note that Section 7 of the SESA (net metering agreement) with GlobalFoundries specifies that the System Owner retains all RECs. The System Owner is defined as GMPSolar-Williston. Next, the recitals of the PPA between GMPSolar-Williston and Green Mountain Power specifies that all of the products are conveyed to GMP except for the portion of energy-only that is net metered by GlobalFoundries

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Corres. 04/24/2017 [16-11-13] (Green Mountain Power) - Please note that Section 7 of the SESA (net metering agreement) with GlobalFoundries specifies that the System Owner retains all RECs. The System Owner is defined as GMPSolar-Williston. Next, the recitals of the PPA between GMPSolar-Williston and Green Mountain Power specifies that all of the products are conveyed to GMP except for the portion of energy-only that is net metered by GlobalFoundries

This filing on the current system (opens in a new tab)