Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority.

Utility Dockets and FilingsConnecticut Public Utilities Regulatory Authority

Compliance with Order No 1 (Fairfield SC12 CT) – Construction Complete

Compliance Filing, Order No. 1

Filed by Robinson & Cole Llp

Part of

Application of Cellco Partnership d/b/a Verizon Wireless for Approval of a Construction Plan to Install Wireless Facilities Within Certain Public Rights-of-Way – Fairfield CT SC12

Type of filing
Compliance filing (Compliance Filing, Order No. 1)
Date filed
January 7, 2022
Filed by
Robinson & Cole Llp
Files
Not listed yet

As listed on the current system

Compliance Filings, 01/07/2022 [16-12-33] Order No.1 / Robinson & Cole Llp / Compliance with Order No 1 (Fairfield SC12 CT) – Construction Complete

This filing on the current system (opens in a new tab)

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)