Docket No. 17-02-49: PURA Formalization of Small Cell Antenna Applicant Processes and Procedures to Construct Facilities in the Connecticut’s Public Rights-of-Way; Motion of Cellco Partnership d/b/a Verizon Wireless for Approval of a Construction Plan to Install Wireless Facilities Within Certain Public Rights-of-Way – PURA Request for Make Ready Determination Information Relative to Motions 113 through 120.
Filed by Robinson + Cole Llp
Part of
PURA Formalization of Small Cell Antenna Applicant Processes and Procedures to Construct Facilities in Connecticut’s Public Rights-of-Way
- Type of filing
- Correspondence
- Date filed
- March 28, 2018
- Filed by
- Robinson + Cole Llp
- Files
- Not listed yet
As listed on the current system
Corres. 03/28/2018 [17-02-49] (Robinson + Cole Llp) - Docket No. 17-02-49: PURA Formalization of Small Cell Antenna Applicant Processes and Procedures to Construct Facilities in the Connecticut’s Public Rights-of-Way; Motion of Cellco Partnership d/b/a Verizon Wireless for Approval of a Construction Plan to Install Wireless Facilities Within Certain Public Rights-of-Way – PURA Request for Make Ready Determination Information Relative to Motions 113 through 120.
Files
The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)