Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Motion No. 141

“Motion of Cellco Partnership d/b/a Verizon Wireless for Approval of a Construction Plan to Install Wireless Facilities within Certain Public Rights-of-Way – New Fairfield SC2 CT

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Motion No. 141 10/12/2018 (Cellco Partnership d/b/a Verizon Wireless) - “Motion of Cellco Partnership d/b/a Verizon Wireless for Approval of a Construction Plan to Install Wireless Facilities within Certain Public Rights-of-Way – New Fairfield SC2 CT [17-02-49]

This filing on the current system (opens in a new tab)