Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Motion No. 516

Application for Approval of Construction of Small Cell Wireless Facilities in the Public Right-of-Way – STAMFORD SC33 CT

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Motion No. 516 03/05/2021 (Cellco Partnership d/b/a Verizon Wireless) - Application for Approval of Construction of Small Cell Wireless Facilities in the Public Right-of-Way – STAMFORD SC33 CT [17-02-49]

This filing on the current system (opens in a new tab)