Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Motion No. 555

Application for Approval of Construction of Small Cell Wireless Facilities in the Public Right-of-Way – EHD BURNSIDE 396 CT

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Motion No. 555 09/23/2021 (Cellco Partnership d/b/a Verizon Wireless) - Application for Approval of Construction of Small Cell Wireless Facilities in the Public Right-of-Way – EHD BURNSIDE 396 CT [17-02-49]

This filing on the current system (opens in a new tab)