Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority.

Utility Dockets and FilingsConnecticut Public Utilities Regulatory Authority

Application for Approval of Construction of Small Cell Wireless Facilities in the Public Right-of-Way – BOLTON SC1 CT

Motion No. 725

Filed by Cellco Partnership d/b/a Verizon Wireless

Part of

PURA Formalization of Small Cell Antenna Applicant Processes and Procedures to Construct Facilities in Connecticut’s Public Rights-of-Way

Type of filing
Motion (Motion No. 725)
Date filed
October 23, 2023
Filed by
Cellco Partnership d/b/a Verizon Wireless
Files
Not listed yet

As listed on the current system

Motion No. 725 10/23/2023 (Cellco Partnership d/b/a Verizon Wireless) - Application for Approval of Construction of Small Cell Wireless Facilities in the Public Right-of-Way – BOLTON SC1 CT [17-02-49]

This filing on the current system (opens in a new tab)

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)