Ruling: Granted
Filed by PURA
Part of
Application of Cellco Partnership d/b/a Verizon Wireless for Approval of a Construction Plan to Install Wireless Facilities Within Certain Public Rights-of-Way – Bridgeport SC18 CT, Merritt Pkwy SC3 CT, New London CT SC7, Trumbull SC4 CT
- Type of filing
- Ruling (Ruling on Motion No. 001)
- Date filed
- June 8, 2017
- Filed by
- PURA
- Files
- Not listed yet
As listed on the current system
Ruling to Motion No.: 001 - 06/08/2017 (PURA) - Type Ruling = Granted [17-04-24]
Files
The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)