Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing, Order No. 1

REFILING AS COMPLIANCE - 2023-03-03 Order No. 1 SCG ESM Calculation Cover Ltr #17-05-42

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Compliance Filings, 04/24/2023 [17-05-42] Order No.1 / Avangrid / REFILING AS COMPLIANCE - 2023-03-03 Order No. 1 SCG ESM Calculation Cover Ltr #17-05-42

This filing on the current system (opens in a new tab)