Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority.

Utility Dockets and FilingsConnecticut Public Utilities Regulatory Authority

Answers to questions 4, 5

Interrogatory responses

Filed by HPC-Eight

Part of

Application for Approval to Install a Water Submetering System at 100 Commons Park North, Stamford, CT

Type of filing
Response (Interrogatory responses)
Date filed
January 26, 2018
Filed by
HPC-Eight
Files
Not listed yet

As listed on the current system

Question(s) Answered , 4, 5 (HPC-Eight) Date Filed: 01/26/2018

This filing on the current system (opens in a new tab)

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)