We missed the deadline to file for an additional 6 month extention on ZRECZS25608. UI had a number of delays. This includes a change during the witness test. This was a change from plans they had originally approved.The material had a 6 week lead time.
Filed by ELC Energy Solutions Inc.No files listed
Part of docket 17-10-19Files
The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)
As listed on the current system
Corres. 10/16/2023 [17-10-19] (ELC Energy Solutions Inc.) - We missed the deadline to file for an additional 6 month extention on ZRECZS25608. UI had a number of delays. This includes a change during the witness test. This was a change from plans they had originally approved.The material had a 6 week lead time.