Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Motion No. 069

Request for Extension of Automatic Contract Termination Date for Doosan Fuel Cell America for Project located at the Fairfield Waste Water Treatment Plant

MotionFiled by Doosan Fuel Cell America, Inc.No files listed
Part of docket 17-10-19Open
  • Electric
Review of LREC/ZREC Projects

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Motion No. 069 05/16/2019 (Doosan Fuel Cell America, Inc.) - Request for Extension of Automatic Contract Termination Date for Doosan Fuel Cell America for Project located at the Fairfield Waste Water Treatment Plant [17-10-19]

This filing on the current system (opens in a new tab)