Motion No. 232
RE: ZS25608 On behalf of Disability Resources Network, we are requesng an extension on the current ZREC (Zero Emission Renewable Energy Credits) ZS25608 located at 340 Capital Ave Bridgeport Ct. 06606 The project was substanally complete when the ulity requested a change at the final inspecon and the part had been back ordered for 60 days (about 2 months). We had an update from the Distributor, and they ancipate delivery the 1st week of December. The project meline history is as follows: Original service agreement start date was 4-1-2022 (Document Atached) We requested the first 6-month extension prior to the 4-1-2023 deadline. (Document Atached) We missed the deadline of 10-1-2023 to file the second 6-month extension. We have completed the terms of the second extension. The applicaon is attached and confirmon that the performance assurance bond has been paid to United Illuminang (document attached) We had ancipated that we should have permission to operate by January 1st, 2024. This was predicated on the remaining equipment meeng the delivery date of December 1st, 2023, and United illuminang being able to schedule the final inspecon in a timely manner. We finally received the equipment in late February and completed the installaon and required UI inspecons. UI Approval to Energize Letter DRN Bridgeport (document attached) Pura Class 1 applicaon DRN Bridgeport Signed (document attached) UI Cerficaon Statement for REC delivery Acceptance DRN Bridgeport ( document attached
Files
The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)
As listed on the current system
Motion No. 232 04/24/2024 (Disability Resources Bridgeport) - RE: ZS25608 On behalf of Disability Resources Network, we are requesng an extension on the current ZREC (Zero Emission Renewable Energy Credits) ZS25608 located at 340 Capital Ave Bridgeport Ct. 06606 The project was substanally complete when the ulity requested a change at the final inspecon and the part had been back ordered for 60 days (about 2 months). We had an update from the Distributor, and they ancipate delivery the 1st week of December. The project meline history is as follows: Original service agreement start date was 4-1-2022 (Document Atached) We requested the first 6-month extension prior to the 4-1-2023 deadline. (Document Atached) We missed the deadline of 10-1-2023 to file the second 6-month extension. We have completed the terms of the second extension. The applicaon is attached and confirmon that the performance assurance bond has been paid to United Illuminang (document attached) We had ancipated that we should have permission to operate by January 1st, 2024. This was predicated on the remaining equipment meeng the delivery date of December 1st, 2023, and United illuminang being able to schedule the final inspecon in a timely manner. We finally received the equipment in late February and completed the installaon and required UI inspecons. UI Approval to Energize Letter DRN Bridgeport (document attached) Pura Class 1 applicaon DRN Bridgeport Signed (document attached) UI Cerficaon Statement for REC delivery Acceptance DRN Bridgeport ( document attached [17-10-19]