Motion No. 232

RE: ZS25608 On behalf of Disability Resources Network, we are reques􀆟ng an extension on the current ZREC (Zero Emission Renewable Energy Credits) ZS25608 located at 340 Capital Ave Bridgeport Ct. 06606 The project was substan􀆟ally complete when the u􀆟lity requested a change at the final inspec􀆟on and the part had been back ordered for 60 days (about 2 months). We had an update from the Distributor, and they an􀆟cipate delivery the 1st week of December. The project 􀆟meline history is as follows: Original service agreement start date was 4-1-2022 (Document Atached) We requested the first 6-month extension prior to the 4-1-2023 deadline. (Document Atached) We missed the deadline of 10-1-2023 to file the second 6-month extension. We have completed the terms of the second extension. The applica􀆟on is attached and confirm􀆟on that the performance assurance bond has been paid to United Illumina􀆟ng (document attached) We had an􀆟cipated that we should have permission to operate by January 1st, 2024. This was predicated on the remaining equipment mee􀆟ng the delivery date of December 1st, 2023, and United illumina􀆟ng being able to schedule the final inspec􀆟on in a 􀆟timely manner. We finally received the equipment in late February and completed the installa􀆟on and required UI inspec􀆟ons. UI Approval to Energize Letter DRN Bridgeport (document attached) Pura Class 1 applica􀆟on DRN Bridgeport Signed (document attached) UI Cer􀆟fica􀆟on Statement for REC delivery Acceptance DRN Bridgeport ( document attached

MotionFiled by Disability Resources BridgeportNo files listed
Part of docket 17-10-19Open
  • Electric
Review of LREC/ZREC Projects

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Motion No. 232 04/24/2024 (Disability Resources Bridgeport) - RE: ZS25608 On behalf of Disability Resources Network, we are reques􀆟ng an extension on the current ZREC (Zero Emission Renewable Energy Credits) ZS25608 located at 340 Capital Ave Bridgeport Ct. 06606 The project was substan􀆟ally complete when the u􀆟lity requested a change at the final inspec􀆟on and the part had been back ordered for 60 days (about 2 months). We had an update from the Distributor, and they an􀆟cipate delivery the 1st week of December. The project 􀆟meline history is as follows: Original service agreement start date was 4-1-2022 (Document Atached) We requested the first 6-month extension prior to the 4-1-2023 deadline. (Document Atached) We missed the deadline of 10-1-2023 to file the second 6-month extension. We have completed the terms of the second extension. The applica􀆟on is attached and confirm􀆟on that the performance assurance bond has been paid to United Illumina􀆟ng (document attached) We had an􀆟cipated that we should have permission to operate by January 1st, 2024. This was predicated on the remaining equipment mee􀆟ng the delivery date of December 1st, 2023, and United illumina􀆟ng being able to schedule the final inspec􀆟on in a 􀆟timely manner. We finally received the equipment in late February and completed the installa􀆟on and required UI inspec􀆟ons. UI Approval to Energize Letter DRN Bridgeport (document attached) Pura Class 1 applica􀆟on DRN Bridgeport Signed (document attached) UI Cer􀆟fica􀆟on Statement for REC delivery Acceptance DRN Bridgeport ( document attached [17-10-19]