Our new report offers the first-ever significant compilation of EV charging infrastructure costs at the component level, and presents essential data that regulators and industry participants have been eager to obtain, but that was only available in piecemeal fashion through laborious searching. It also found that “soft costs” in deploying EV charging infrastructure—such as permitting delays, utility interconnection application processes, compliance with regulations, obtaining easements, and re-engineering projects because they were based on incorrect information—are some of the largest and most unpredictable costs that developers of charging networks encounter, and are often the reason why a candidate site for a charging station is rejected or abandoned, even after significant costs have been incurred.
Files
The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)
As listed on the current system
Corres. 01/21/2020 [17-12-03RE04] (Rocky Mountain Institute) - Our new report offers the first-ever significant compilation of EV charging infrastructure costs at the component level, and presents essential data that regulators and industry participants have been eager to obtain, but that was only available in piecemeal fashion through laborious searching. It also found that “soft costs” in deploying EV charging infrastructure—such as permitting delays, utility interconnection application processes, compliance with regulations, obtaining easements, and re-engineering projects because they were based on incorrect information—are some of the largest and most unpredictable costs that developers of charging networks encounter, and are often the reason why a candidate site for a charging station is rejected or abandoned, even after significant costs have been incurred.