Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing, Order No. EOE-1

Response of First Point Power, LLC to EOE-1 through EOE-13

Compliance filingFiled by First Point Power, LlcNo files listed
Part of docket 18-06-02RE01Closed
  • Electric
Two-Year Review Required Pursuant to Conn. Gen. Stat. § 16-245o(m)

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Compliance Filings, 06/08/2022 [18-06-02RE01] Order No.EOE-1 through EOE-13 / First Point Power, Llc / Response of First Point Power, LLC to EOE-1 through EOE-13

This filing on the current system (opens in a new tab)