Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 48 thru 48

ResponseFiled by Constellation NewEnergy, Inc.No files listed
Part of docket 18-06-02RE01Closed
  • Electric
Two-Year Review Required Pursuant to Conn. Gen. Stat. § 16-245o(m)

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Question(s) Answered 48 thru 48 (Constellation NewEnergy, Inc.) Date Filed: 09/30/2022

This filing on the current system (opens in a new tab)