Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 24 thru 24

ResponseFiled by Reliant Energy Northeast LLCNo files listed
Part of docket 18-06-02RE01Closed
  • Electric
Two-Year Review Required Pursuant to Conn. Gen. Stat. § 16-245o(m)

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Question(s) Answered 24 thru 24 (Reliant Energy Northeast LLC) Date Filed: 08/04/2022

This filing on the current system (opens in a new tab)