Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Written Comments

CommentsFiled by Davis, Malm & D'agostine, P.c.No files listed
Part of docket 18-06-02RE01Closed
  • Electric
Two-Year Review Required Pursuant to Conn. Gen. Stat. § 16-245o(m)

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Written Comments - 03/02/2023 [18-06-02RE01] (Davis, Malm & D'agostine, P.c.)

This filing on the current system (opens in a new tab)