Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Brief, 05/15/2019 03:22:56 PM (Connecticut Department Of Energy And Environmental Protection)

BriefFiled by Connecticut Department Of Energy And Environmental ProtectionNo files listed
Part of docket 18-08-33Closed
  • Electric
PURA Implementation of Section 7 of Public Act 18-50

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Brief, 05/15/2019 03:22:56 PM (Connecticut Department Of Energy And Environmental Protection) [18-08-33]

This filing on the current system (opens in a new tab)