Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority.

Utility Dockets and FilingsConnecticut Public Utilities Regulatory Authority

To Guardian Water and Power; Stamford Building I, LLC, questions 1 thru 9

Interrogatories

Filed by CA

Part of

Application of Stamford Building I LLC for Approval to Use a Water Submetering System at Stamford Urby, I Greyrock Place, Stamford, Connecticut

Type of filing
Interrogatory (Interrogatories)
Date filed
November 27, 2018
Filed by
CA
Files
Not listed yet

As listed on the current system

Interrogs from CA to Guardian Water and Power;Stamford Building I, LLC 1 thru 9-Issued 11/27/2018 [18-09-09]

This filing on the current system (opens in a new tab)