Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Motion No. 008

Motion No. 8 - Motion to Install Wireless Facilities Within Certain Public Rights-of-Way

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Motion No. 008 05/06/2019 (Crown Castle Fiber LLC) - Motion No. 8 - Motion to Install Wireless Facilities Within Certain Public Rights-of-Way [19-04-05]

This filing on the current system (opens in a new tab)