Ruling: Granted
Filed by PURA
Part of
Application of Crown Castle Fiber, LLC d/b/a Atrium Networks, LLC for Approval of a Construction Plan to Install Wireless Facilities Within Certain Public Rights-of-Way
- Type of filing
- Ruling (Ruling on Motion No. 080)
- Date filed
- September 18, 2019
- Filed by
- PURA
- Files
- Not listed yet
As listed on the current system
Ruling to Motion No.: 080 - 09/18/2019 (PURA) - Type Ruling = Granted [19-04-05]
Files
The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)