Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority.

Utility Dockets and FilingsConnecticut Public Utilities Regulatory Authority

Approval of a Construction Plan to Install Wireless Facilities Within Certain Public Rights-of-Way--Town of Ledyard

Motion No. 095

Filed by Crown Castle Fiber LLC

Part of

Application of Crown Castle Fiber, LLC d/b/a Atrium Networks, LLC for Approval of a Construction Plan to Install Wireless Facilities Within Certain Public Rights-of-Way

Type of filing
Motion (Motion No. 095)
Date filed
February 10, 2020
Filed by
Crown Castle Fiber LLC
Files
Not listed yet

As listed on the current system

Motion No. 095 02/10/2020 (Crown Castle Fiber LLC) - Approval of a Construction Plan to Install Wireless Facilities Within Certain Public Rights-of-Way--Town of Ledyard [19-04-05]

This filing on the current system (opens in a new tab)

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)