Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Motion No. 114

Motion for Approval of a Construction Plan to Install Wireless Facilities Within the Public Right-of-Way - BGT_ERWP_058_CT

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Motion No. 114 01/04/2025 (Crown Castle Fiber LLC) - Motion for Approval of a Construction Plan to Install Wireless Facilities Within the Public Right-of-Way - BGT_ERWP_058_CT [19-04-05]

This filing on the current system (opens in a new tab)