Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Written Comments

CommentsFiled by Connecticut Fund For The Environment/save The SoundNo files listed
Part of docket 19-07-01RE02Closed
  • Electric
Review of Statewide Shared Clean Energy Facility Program Requirements – Year 2 Procurement

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Written Comments - 03/12/2021 [19-07-01RE02] (Connecticut Fund For The Environment/save The Sound)

This filing on the current system (opens in a new tab)