Draft Decision
Filed
Part of
Application of Doosan Energy Solutions America, Inc. for Qualification of 330 One Rod Highway (Water Plant), Fairfield, CT as a Class I Renewable Energy Source
- Type of filing
- Draft decision (Draft Decision)
- Date filed
- February 21, 2020
- Filed by
- Not recorded
- Files
- Not listed yet
As listed on the current system
Draft Decision, 02/21/2020 [19-12-13]
Files
The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)