Draft decisionFiled
Draft Decision
Part of
Docket 21-01-22Closed again
Application of SmartestEnergy US, LLC for a Connecticut Electric Supplier License
- Type of filing
- Draft decision (Draft Decision)
- Date filed
- March 30, 2021
- Filed by
- Not recorded
- Files
- Not listed yet
As listed on the current system: Draft Decision, 03/30/2021 [21-01-22]
Files
The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)