16-245y(b) Annual Filing
Filed by Catalyst Power
Part of
Application of Catalyst Power & Gas, LLC for a Connecticut Electric Supplier License
- Type of filing
- Compliance filing (Compliance Filing)
- Date filed
- September 27, 2026
- Filed by
- Catalyst Power
- Files
- Not listed yet
As listed on the current system
Compliance Filings, 09/27/2026 [21-03-02] Order No.N/A / Catalyst Power / 16-245y(b) Annual Filing
Files
The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)