Motion No. 025
EMERGENCY MOTION with the Authority to eliminate the requirement on the United Illuminating portal that all project applications apply for Interconnection as a pre-requisite for the portal to accept an application.
Filed by SolarConnecticutNo files listed
Part of docket 21-08-03Files
The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)
As listed on the current system
Motion No. 025 02/11/2022 (SolarConnecticut) - EMERGENCY MOTION with the Authority to eliminate the requirement on the United Illuminating portal that all project applications apply for Interconnection as a pre-requisite for the portal to accept an application. [21-08-03]