Motion No. 025

EMERGENCY MOTION with the Authority to eliminate the requirement on the United Illuminating portal that all project applications apply for Interconnection as a pre-requisite for the portal to accept an application.

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Motion No. 025 02/11/2022 (SolarConnecticut) - EMERGENCY MOTION with the Authority to eliminate the requirement on the United Illuminating portal that all project applications apply for Interconnection as a pre-requisite for the portal to accept an application. [21-08-03]

This filing on the current system (opens in a new tab)