Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Comments

CorrespondenceFiled by NECA Board MembersNo files listed
Part of docket 21-08-06Closed
  • Electric
Annual Review of the Electric Vehicle Charging Program – Year 1

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Corres. 11/09/2021 [21-08-06] (NECA Board Members) - Comments

This filing on the current system (opens in a new tab)