Compliance Filing, Order No. 21-10-13
Our equipment is still on back-order however attached is the PO for the equipment we ordered
Filed by Watertown Public SchoolsNo files listed
Part of docket 21-10-13Files
The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)
As listed on the current system
Compliance Filings, 11/29/2022 [21-10-13] Order No.21-10-13 / Watertown Public Schools / Our equipment is still on back-order however attached is the PO for the equipment we ordered