Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatories

To Eversource, questions 16 thru 26

InterrogatoryFiled by RSRNo files listed
Part of docket 22-06-05Closed
  • Electric
PURA Implementation of Public ACT 22-55

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Interrogs from RSR to Eversource 16 thru 26-Issued 03/10/2023 [22-06-05]

This filing on the current system (opens in a new tab)

Interrogatories, docket 22-06-05 | Connecticut utility dockets