Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Brief, 10/18/2022 03:55:32 PM (Dept. Of Energy & Envir. Prot.)

BriefFiled by Dept. Of Energy & Envir. Prot.No files listed
Part of docket 22-08-06Closed
  • Electric
Annual Review of the Electric Vehicle Charging Program – Year 2

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Brief, 10/18/2022 03:55:32 PM (Dept. Of Energy & Envir. Prot.) [22-08-06]

This filing on the current system (opens in a new tab)