Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing, Order No. 2

Annual Review of the Electric Vehicle Charging Program –Year 2 - Compliance with Order No. 2 in Docket No. 17-12-03RE04

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Compliance Filings, 06/30/2022 [22-08-06] Order No.2 / Avangrid / Annual Review of the Electric Vehicle Charging Program –Year 2 - Compliance with Order No. 2 in Docket No. 17-12-03RE04

This filing on the current system (opens in a new tab)