Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority.

Utility Dockets and FilingsConnecticut Public Utilities Regulatory Authority

Correspondence requiring applicant to file Exhibit E-1 by 3/25/24 deadline

Correspondence

Filed by EOE - PURA

Part of

Application for Water Submetering Approval at 1 Greyrock Place, Stamford, CT

Type of filing
Correspondence
Date filed
March 13, 2024
Filed by
EOE - PURA
Files
Not listed yet

As listed on the current system

Corres. 03/13/2024 [23-11-25] (EOE - PURA) - Correspondence requiring applicant to file Exhibit E-1 by 3/25/24 deadline

This filing on the current system (opens in a new tab)