Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

VEC Public Comment, along with attached Email to PURA and 2022 IEEE research article on the inaccuracy of static energy meters during in situ testing, demonstrating errors up to 925%, based upon advanced comparative analysis.

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Corres. 05/02/2024 [24-01-03] (Self-Employed) - VEC Public Comment, along with attached Email to PURA and 2022 IEEE research article on the inaccuracy of static energy meters during in situ testing, demonstrating errors up to 925%, based upon advanced comparative analysis.

This filing on the current system (opens in a new tab)