Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority.

Utility Dockets and FilingsConnecticut Public Utilities Regulatory Authority

Second Quarter Compliance Filing

Correspondence

Filed by Murtha Cullina LLP

Part of

Application for Approval to Install and use an Electricity Submetering System at 430 John Street, Bridgeport, CT

Type of filing
Correspondence
Date filed
September 15, 2025
Filed by
Murtha Cullina LLP
Files
Not listed yet

As listed on the current system

Corres. 09/15/2025 [24-11-07] (Murtha Cullina LLP) - Second Quarter Compliance Filing

This filing on the current system (opens in a new tab)